Skip to content

FDG - Available Drawings

Dashboard

Comments on the content of the FDG and its documents should be directed to fdg-feedback@mailman.stanford.edu and the responsible organization as shown in the right-hand column next to each of the individual drawings. See also: Proposing a Revision.

Last updated: April 2020

To download all current FDG drawing files:

For Previous FDG versions:

To request FDG drawings prior to 2017, contact maps-requests@mailman.stanford.edu


Please note: Contractors are responsible for customizing drawings so that they apply to individual projects. Stanford Title Blocks should be removed when FDG drawings are used. Drawings are available in PDF and CAD formats.

To submit a new drawing, or propose a revision, please send email to: fdg-feedback@mailman.stanford.edu. If you have questions about specific drawings, please email the appropriate FDG committee representative by clicking the Responsible Organization link.

Drawing Category: Architectural

Drawing No     

View PDF

Download DWG Title Responsible Organization Approve Date
MA-02 Save Roof Curb Detail Zone Management February 2018
MA-03 Save Janitor Closets Zone Management February 2018
MA-04-01 Save Pneumatic Bollard and Cabinet Zone Management February 2011
MA-04-02 Save Pneumatic Bollard and Cabinet Zone Management February 2011
MA-04-03 Save Pneumatic Bollard and Cabinet Zone Management February 2011
MA-04-04 Save Pneumatic Bollard and Cabinet Zone Management February 2011
MA-07 Save Contour Bench In Paving University Architect/Campus Planning and Design February 2018
MA-08 Save Contour Bench Along Pedestrian Path University Architect/Campus Planning and Design February 2018
MA-10 Save Courtyard Bench Mount University Architect/Campus Planning and Design February 2018
MA-12 Save LR Series Bike Rack Details University Architect/Campus Planning and Design February 2017
MA-13 Save Bike Rack Dimensions And Placement University Architect/Campus Planning and Design February 2017
MA-14 Save Bike Rack Anchor In Asphalt University Architect/Campus Planning and Design February 2012
MA-15 Save Bike Rack Mounting In Stone Fines University Architect/Campus Planning and Design February 2012
MA-16 Save Dumpster Enclosure University Architect/Campus Planning and Design February 2020
MA-17-01 Save Covered Dumpster Enclosure (Sheet 1 of 2) University Architect/Campus Planning and Design February 2020
MA-17-02 Save Covered Dumpster Enclosure (Sheet 2 of 2) University Architect/Campus Planning and Design February 2019
MA-18 Save Custom Recycle Receptacle Layout University Architect/Campus Planning and Design February 2017
MA-19 Save Steel Header At Stone Fines University Architect/Campus Planning and Design February 2015
MA-20 Save Concrete Footing At Trash Receptacle University Architect/Campus Planning and Design February 2017
MA-21 Save Wood Header University Architect/Campus Planning and Design February 2015
MA-22 Save Bentonite Waterproofing Zone Management February 2013
MA-23 Save Self-Adhering Sheet Waterproofing Zone Management February 2013
MA-24-01 Save Planter Detail Zone Management February 2014
MA-24-02 Save Planter Drain Detail Zone Management February 2014
MA-25 Save Terrace Edge Detail Zone Management February 2014
MA-26-01 Save Floor Drain Plan in Raised Terrace Zone Management February 2014
MA-26-02 Save Floor Drain in Raised Terrace Zone Management February 2014
MA-27 Save PVC Roofing Zone Management February 2014
MA-28 Save Clay Roofing Zone Management February 2014
MA-29 Save Clay Roofing - Historic Zone Management February 2014
MA-30 Save Built-Up Roofing Zone Management February 2014
MA-31 Save Stone Fines Paving University Architect/Campus Planning and Design February 2015
MA-32 Save Gravel Band at Sandstone Buildings University Architect/Campus Planning and Design February 2017
MA-33-01 Save Power-operated Door Operator and Card Reader (Sheet 1 of 2) University Architect/Campus Planning and Design February 2018
MA-33-02 Save Power-operated Door Operator and Card Reader (Sheet 2 of 2) University Architect/Campus Planning and Design February 2018
MA-34 Save ADA Post with Steeple University Architect/Campus Planning and Design April 2020

Back to top

Drawing Category: Civil

Drawing No

View PDF

Download DWG Title Responsible Organization Approve Date
CS-101 Save Tapping Sleeve and Valve Utilities Civil Infrastructure System February 2009
CS-102 Save Gate Valve Box Utilities Civil Infrastructure System February 2018
CS-103 Save Blow Off Valve Utilities Civil Infrastructure System February 2017
CS-104 Save Air Relief Valve Assembly Utilities Civil Infrastructure System February 2020
CS-106 Save Gate Valve Nut Extention Utilities Civil Infrastructure System February 2009
CS-111 Save Thrust Block For Tees Utilities Civil Infrastructure System February 2009
CS-112 Save Water Main Stub-out And Thrust Block Utilities Civil Infrastructure System February 2009
CS-113 Save Elbow Thrust Block (Horizontal And Downward Thrusts) Utilities Civil Infrastructure System February 2009
CS-114 Save Elbow Anchor Block (Upward Thrust) Utilities Civil Infrastructure System February 2009
CS-115 Save Reducer Anchor Utilities Civil Infrastructure System February 2009
CS-116 Save In-line Gate Valve Anchor Utilities Civil Infrastructure System February 2009
CS-117 Save Lab wastewater sample port Utilities Civil Infrastructure System February 2012
CS-122 Save Water Services 4" and Larger Utilities Civil Infrastructure System February 2017
CS-123 Save Water Meter Installation Utilities Civil Infrastructure System February 2020
CS-130 Save Reduced Pressure Backflow Preventer (3/4"-2") Utilities Civil Infrastructure System February 2020
CS-133 Save Domestic Water Backflow Reduced Pressure Assy. Utilities Civil Infrastructure System February 2020
CS-134 Save Double Check Backflow Preventer Assy. & Fire Dept. Conn. Utilities Civil Infrastructure System February 2020
CS-171 Save Fire Hydrant Utilities Civil Infrastructure System February 2009
CS-172 Save Fire Hydrant Guard Posts (2-3 Post Configuration) Utilities Civil Infrastructure System February 2011
CS-174 Save Fire Hydrant Guard Posts (4- Post Configuration) Utilities Civil Infrastructure System February 2009
CS-189 Save Typical Chilled Water Trench Section Utilities Civil Infrastructure System February 2017
CS-190 Save Alternate Chilled Water Trench Section Utilities Civil Infrastructure System February 2017
CS-191 Save Trench Backfill and Surface Restoration Utilities Civil Infrastructure System February 2017
CS-192 Save Standard Monument Utilities Civil Infrastructure System February 2009
CS-201 Save Stanford Sewer Manhole Utilities Civil Infrastructure System February 2017
CS-202 Save Drop Manhole Connection Utilities Civil Infrastructure System February 2014
CS-203 Save Standard Manhole Base Sections Utilities Civil Infrastructure System February 2009
CS-204 Save Storm Sewer Manhole Frame And Cover Utilities Civil Infrastructure System February 2018
CS-205 Save Sanitary Sewer Manhole Frame And Cover Utilities Civil Infrastructure System February 2009
CS-211 Save Sanitary Sewer Lateral Utilities Civil Infrastructure System February 2017
CS-212 Save Sanitary Sewer Cleanout Utilities Civil Infrastructure System February 2017
CS-213 Save Blue tower PLC-3 Column: Pad Dimensions Utilities Civil Infrastructure System February 2009
CS-261 Save Catch Basin Utilities Civil Infrastructure System February 2017
CS-262 Save Catch Basin With Round Grate Utilities Civil Infrastructure System February 2009
CS-263 Save Stanford Curb Inlet Utilities Civil Infrastructure System February 2009
CS-264 Save P.C.C. Gutter Depression Utilities Civil Infrastructure System February 2009
CS-265 Save Reticuline Frame And Grate Utilities Civil Infrastructure System February 2009
CS-271 Save Storm Drain Inlet And Cleanout Utilities Civil Infrastructure System February 2009
CS-272 Save Frame And Grate For Storm Drain Inlet And Cleanout Utilities Civil Infrastructure System February 2017
CS-273 Save Standard Face Of Curb Drain Outlet Utilities Civil Infrastructure System February 2009
CS-275 Save Curb Drain Detail Utilities Civil Infrastructure System March 2010
CS-276 Save Manhole Cover Rosette Design Utilities Civil Infrastructure System February 2009
CS-281 Save Sacked Concrete Headwall Utilities Civil Infrastructure System February 2009
CS-282-01 Save Concrete Headwall With Trashrack (Sheet 1 of 2) Utilities Civil Infrastructure System February 2009
CS-282-02 Save Concrete Headwall With Trashrack (Sheet 2 of 2) Utilities Civil Infrastructure System February 2009
CS-283 Save Driveway Approach Utilities Civil Infrastructure System February 2009
CS-284 Save Concrete Sidewalk Utilities Civil Infrastructure System February 2009
CS-285 Save Concrete Swale Utilities Civil Infrastructure System February 2009
CS-286 Save Asphalt Sidewalk Utilities Civil Infrastructure System February 2017
CS-289 Save Concrete Curb Utilities Civil Infrastructure System February 2009
CS-290 Save Rolled Curb and Gutter Utilities Civil Infrastructure System February 2009
CS-291 Save Concrete Curb and Gutter Utilities Civil Infrastructure System February 2009
CS-292-01 Save Straight ADA Ramp with Detectable Warning Paver Utilities Civil Infrastructure System and UA/CPD Office February 2017
CS-292-02 Save Flared ADA Ramp with Detectable Warning Paver Utilities Civil Infrastructure System and UA/CPD Office February 2017
CS-292-03 Save Flush Condition with Detectable Warning Paver Utilities Civil Infrastructure System and UA/CPD Office February 2017
CS-293 Save Detectable Warning Paver Construction Detail Utilities Civil Infrastructure System and UA/CPD Office February 2015
CS-294 Save Sign and Post Utilities Civil Infrastructure System February 2015
CS-295 Save Anode Test Station - Dip & Copper Service Lateral Pipe Utilities Civil Infrastructure System February 2009
CS-296 Save Anode Test Station - Tee & Valve Utilities Civil Infrastructure System February 2009
CS-297 Save Anode Test Station - Sprinker Riser Utilities Civil Infrastructure System February 2009
CS-298 Save Anode Test Station - Fire Hydrant Utilities Civil Infrastructure System February 2009
CS-299 Save Exothermic Welding Utilities Civil Infrastructure System February 2009
CS-300 Save Dielectric Insulation Joint Utilities Civil Infrastructure System February 2009
CS-301 Save Steam Manhole Access Layout Utilities Civil Infrastructure System February 2009
CS-302 Save Copper Water Service Utilities Civil Infrastructure System February 2009
CS-303 Save Joint Bonding Jumper Installation Utilities Civil Infrastructure System February 2009
CS-304 Save Bollard - Wood Removable University Architect/Campus Planning and Design February 2011
CS-305 Save Bollard – Wood Fixed University Architect/Campus Planning and Design February 2011
CS-306 Save Bollard Fire Access Spacing – Wood University Architect/Campus Planning and Design February 2011
CS-307 Save Bollard Spacing – Metal University Architect/Campus Planning and Design February 2011
CS-308 Save Bollard - Metal Removable University Architect/Campus Planning and Design February 2011
CS-309 Save Bollard - Metal Fixed University Architect/Campus Planning and Design February 2017
CS-310 Save Bollard Fire Access Spacing - Metal Removable University Architect/Campus Planning and Design February 2011
CS-311 Save Equipment Protection Bollard University Architect/Campus Planning and Design February 2018
CS-312 Save Water Sampling Station Utilities Civil Infrastructure System February 2017
CS-313 Save Lake Water Hydrant Utilities Civil Infrastructure System February 2017
CS-314 Save Storm Drain Cleanout Utilities Civil Infrastructure System February 2017
CS-315 Save Typical Crosswalk Detail Utilities Civil Infrastructure System March 2018
CS-316 Save Standard Pavement Hump (Parabolic Hump) Utilities Civil Infrastructure System February 2018

Back to top

Drawing Category: Communications

Drawing No

View PDF

Download DWG Title Responsible Organization Approve Date
CM-01 Save Power strips edit Communications Services February 2018
CM-02 Save Grounding busbar Communications Services February 2018
CM-03 Save Conduit stubs non-access single TSO Communications Services February 2018
CM-04 Save Conduit stubs non-access multiple Communications Services February 2018
CM-05 Save Conduit stubs access single TSO Communications Services February 2018
CM-06 Save Conduit stubs access multiple TSO Communications Services February 2018
CM-07 Save Typical telecom closet Communications Services February 2018
CM-08 Save Typical vertical sleeve Communications Services February 2018
CM-09 Save Typical horizontal sleeve Communications Services February 2018
CM-10 Save Wall phone TSO Communications Services February 2018
CM-11 Save Maintenance hole sideview Communications Services February 2018
CM-12 Save Maintenance hole Communications Services February 2018
CM-13 Save Maintenance hole frame Communications Services February 2018
CM-14 Save Maintenance hole butterfly Communications Services February 2018
CM-19 Save Emergency Phone Mounts Communications Services February 2018
CM-20 Save Card Reader with or without Crash Bar Communications Services February 2018
CM-21 Save Single Button Emergency Button Communications Services February 2018
CM-22 Save Typical Card Reader Enclosure 3 For Laundry Room Applications Communications Services July 2003
CM-25 Save Flush Mount Elevator Phone Detail Communications Services February 2018
CM-26 Save Surface Mount Elevator Phone Communications Services February 2018
CM-27 Save EZ-Path DoublePathway Concrete Floor Communications Services February 2018
CM-28 Save EZ-Path Pathway Concrete/Block Wall Retrofit Communications Services February 2018
CM-29 Save EZ-Path Single Pathway Concrete Floor Communications Services February 2018
CM-30 Save EZ-Path Triple Pathway Concrete Floor Communications Services February 2018
CM-31 Save EZ-Path Double Pathway Concrete/Block Wall Installation Communications Services February 2018
CM-32 Save EZ-Path Double Pathway Gypsum Board Installation Communications Services February 2018
CM-33 Save EZ-Path Single Pathway Gypsum Board Retrofit Communications Services February 2018
CM-34 Save EZ-Path Single Pathway Concrete/Block Wall Installation Communications Services February 2018
CM-35 Save EZ-Path Single Pathway Gypsum Board Installation Communications Services February 2018
CM-36 Save EZ-Path Triple Pathway Concrete/Block Wall Installation Communications Services February 2018
CM-37 Save EZ-Path Triple Pathway Gypsum Board Installation Communications Services February 2018
CM-38 Save SBC-38Y-4046-1 Maintenance Hole Communications Services February 2018
CM-39 Save SBC-3660 SB Communications Services February 2018
CM-40 Save SBC-4878 SB Communications Services February 2018
CM-41 Save PTS-1730 MH Communications Services February 2018
CM-42 Save PTS-3048 MH Communications Services February 2018
CM-43 Save Typical Trench Cross Section-Asphalt Street Communications Services February 2018
CM-44 Save Typical Trench Cross Section-Asphalt Street Communications Services February 2018
CM-100 Save Access Control Panel (ACP) Plywood Backboard Communications Services February 2009
CM-101 Save ACES1 (EH, CR, DMA & CAM) Communications Services February 2012
CM-102 Save ACES1 (ML, CR, ADA, DMA & Camera) Communications Services February 2012
CM-103 Save ACES1 (EH, CR, DMA & CAM) Communications Services February 2012
CM-104 Save ACES1 (CB, CR, ADA, DMA & Camera) Communications Services February 2012
CM-105 Save ACES2 (CB, CR, ADA, DMA & CAM) Communications Services February 2012
CM-106 Save ACES2 (ML, CR, ADA, DMA & CAM) Communications Services February 2012
CM-107 Save ACES Elevator Card Reader (CR) Camera (CAM) Communications Services February 2012
CM-108 Save ACES Symbols Legend Communications Services February 2012
CM-109 Save ACES Control Panel-Telecom Room Communications Services February 2012
CM-110 Save 8 Readers Typ. Panel Elevation Communications Services February 2012
CM-111 Save 16 Readers Typ. Panel Elevation Communications Services February 2012
CM-112 Save Panel Wiring Communications Services February 2012
CM-112-01 Save Panel Wiring Communications Services February 2012
CM-112-02 Save Panel Wiring Communications Services February 2012
CM-113 Save Hoffman Engineering ASE 16x12x4 Communications Services February 2012
CM-114 Save Card Reader Door Wiring W/SP-3 Speech Processor Communications Services February 2012
CM-115 Save Card Reader Door Wiring W/SP-3 Speech Processor Communications Services February 2012
CM-116 Save Alarm Door Wiring W/SP-3 Speech Processor Communications Services February 2012
CM-117 Save Alarm Door Wiring W/SP-3 Speech Processor Communications Services February 2012
CM-118 Save Card Reader Door Wiring W/SP-3 Speech Processor Communications Services February 2012
CM-118-01 Save Card Reader Door W/ADA and Wireless Remote Communications Services February 2012
CM-119 Save Access Control Panel Telecom Room Communications Services February 2015

Back to top

Drawing Category: Electrical

Drawing No

View PDF

Download DWG Title Responsible Organization Approve Date
ES-01 Save Transformer Pad, Three-phase, 112.5 to 500 KVA Utilities Division October 1999
ES-02-01 Save Lantern Style Path Light Utilities Division and UA/CPD Office February 2020
ES-02-02 Save Globe Light (Formerly SU-I) Utilities Division and UA/CPD Office February 2020
ES-02-03 Save Roadway Light, Cobrahead (Formerly SU-III) Utilities Division and UA/CPD Office February 2016
ES-02-04 Save Roadway Light at Roundabout Utilities Division and UA/CPD Office February 2020
ES-02-05 Save Roadway Light, Shoebox Utilities Division and UA/CPD Office February 2020
ES-02-06 Save Parking Lot Light, Shoebox Utilities Division and UA/CPD Office February 2020
ES-02-07 Save Acorn Light, Intersection Utilities Division and UA/CPD Office February 2020
ES-02-08 Save Acorn Light, Ceremonial (Formerly SU-II) Utilities Division and UA/CPD Office February 2020
ES-02-09 Save Contemporary Area Light Utilities Division and UA/CPD Office February 2020
ES-06 Save Transformer - Low Voltage Connection Detail Utilities Division October 1999
ES-07 Save Ground Detail For Padmount Transformer Utilities Division February 1998
ES-08-01 Save Equipment Type Designation System (Sheet 1 of 2) Utilities Division February 1998
ES-08-02 Save Equipment Type Designation System (Sheet 2 of 2) Utilities Division February 1998
ES-09 Save Standard Service Grounding Utilities Division February 1998
ES-11 Save Standard Conduit Arrangements For Building Projects Utilities Division October 1998
ES-12 Save Emergency Diesel Generator Alarms Utilities Division October 1999
ES-13 Save Electrical Information Standard Nameplate Utilities Division October 1999
ES-14 Save Electrical Equipment & Informational Nameplate Utilities Division October 1999
ES-15-01 Save Pre-Cast Vault Detail (Sheet 1 of 3) Utilities Division October 1999
ES-15-02 Save Pre-Cast Vault Detail (Sheet 2 of 3) Utilities Division October 1999
ES-15-03 Save Pre-Cast Vault Detail (Sheet 3 of 3) Utilities Division October 1999
ES-16 Save Vault Extensions Utilities Division October 1999
ES-17-01 Save Traffic Covers Utilities Division October 1999
ES-17-02 Save Traffic Covers Utilities Division October 1999
ES-18 Save Padmount Transformers - Clearance to Structure Utilities Division March 2000
ES-19 Save HIVOLT Cable Tag Scheme Utilities Division November 2000
ES-20 Save HIVOLT Trench - Typical Utilities Division February 2012
ES-21-01 Save Manhole Cover Type "A" - Standard Design Utilities Division February 2019
ES-21-02 Save Manhole Cover Rosette Design Utilities Division February 2019
ES-22-03 Save Wiring Diagram PM8000 Meter System Utilities Division February 2016
ES-24-01 Save Blue Tower PLC-3 Column: Installation Diagram Utilities Division and UA/CPD Office February 2016
ES-24-02 Save Blue Tower PLC-8A Column: Schematic Diagram Utilities Division February 2016
ES-25 Save Street Light Control Circuit For 480/208V 3 Phase Power Utilities Division August 2001
ES-26-01 Save Sign Standards 1 of 3 Utilities Division February 2003
ES-26-02 Save Sign Standards 2 of 3 Utilities Division February 2003
ES-26-03 Save Sign Standards 3 of 3 Utilities Division February 2003
ES-27-01 Save 4-Way Padmount Switch on Vault Utilities Division April 2007
ES-27-02 Save 5-Way Padmount Switch on Vault Utilities Division April 2007
ES-27-03 Save 6-Way Padmount Switch on Vault Utilities Division April 2007
ES-29 Save Variable Frequency Drive Utilities Division February 2013
ES-30 Save Cart Charging Drawing Detail Utilities Division February 2017
ES-31 Save Transformer Anchoring Utilities Division February 2019

Back to top

Drawing Category: Irrigation

Drawing No

View PDF

Download DWG Title Responsible Organization Approve Date
IR-01 Save Sequence of Installation / Mainline Grounds February 2020
IR-02 Save Master Pressure Regulator Installation Grounds February 2020
IR-03 Save Lake Water Filter Installation Grounds February 2020
IR-04 Save Lake Water Filter Enclosure Installation Grounds February 2020
IR-05 Save Master Control Valve Installation Grounds February 2020
IR-06 Save Flow Sensor Installation Grounds February 2020
IR-07 Save Main & Lateral Irrigation Line Depth Grounds February 2016
IR-08 Save Valve Box Installation Grounds February 2020
IR-09 Save Pedestal Mount Controller Installation Grounds February 2020
IR-10 Save Wall Mount Controller Assembly Grounds February 2016
IR-11 Save Remote Control Valve Assembly Grounds February 2020
IR-12 Save 1” Drip Valve Assembly Installation- Low Flow Grounds February 2016
IR-13 Save Drip Valve Assembly >1”-Highflow Grounds February 2020
IR-14 Save 3M Direct Bury Wire Splice Grounds February 2016
IR-15 Save Gate Valve & Wire Stub Out Installation For Future Irr. Grounds February 2016
IR-16 Save 2 ½” and Smaller Gate Valve Installation Grounds February 2016
IR-17 Save 3” & 4” Gate Valve Installation Grounds February 2016
IR-18 Save Gate Valve Stub Out Installation Grounds February 2016
IR-19 Save Quick Coupling Valve Installation Grounds February 2016
IR-20 Save Pop-Up Spray Installation Grounds February 2016
IR-21 Save Rotor Pop-Up Installation Grounds February 2016
IR-22 Save Bubbler Irrigation For Trees Grounds February 2016
IR-23 Save Drip Loop Irrigation For Trees Or Shrubs Grounds February 2016
IR-24 Save Sub Surface Drip Irr. For Shrub/Turf Planting-End Feed Grounds February 2020
IR-25 Save Sub Surface Drip Irr. For Shrub/Turf Planting-Center Feed Grounds February 2020
IR-26 Save Sub Surface-Drip Irrigation Flush Valve Installation Grounds February 2016
IR-27 Save UNIK System *Only With LBRE Grounds Approval Grounds February 2016
IR-28 Save Concrete Sprinkler Block - Type B Grounds February 2016

Back to top

Drawing Category: Mechanical

Drawing No

View PDF

Download DWG Title Responsible Organization Approve Date
MM-01 Save Piping Legend Zone Management February 2019
MM-02 Save In-line Circulation Pump Zone Management February 2018
MM-03 Save Process Cooling Equipment Connection Zone Management February 2018
MM-04 Save Steam Pressure Relief Valve Zone Management February 2018
MM-05 Save Standard Arrangement for Earthquake Valve Installation Zone Management February 2018
MM-06 Save Fire Damper Installation (Typ) Zone Management February 2018
MM-07 Save Utility Exhaust Fan Installation Zone Management February 2018
MM-08 Save Exhaust Fan Zone Management February 2018
MM-09-01 Save Safety Shower and Eye Wash Zone Management February 2019
MM-09-02 Save Recessed Safety Station With Drain Pan and Daylight Drain Zone Management February 2019
MM-10 Save Air Vent Detail Zone Management February 2018
MM-11 Save RWL Connection W/ Clean Out Zone Management February 2011
MM-12 Save Typical Water Filter Connection Zone Management February 2018
MM-13 Save Gas Cabinet - ETB and Tool Piping Typical Zone Management February 2018
MM-14 Save Valve Manifold in an Exhaust Termination Box Zone Management February 2018
MM-15 Save Backflow Preventer Zone Management February 2018
MM-16 Save Pump Mounting Detail Zone Management February 2019
MM-17 Save Closed Loop Heating Hot Water System Chemical Feeder Zone Management February 2019
MM-19 Save Large Hot Water Heating System Control Valve and Piping Zone Management February 2018
MM-20 Save Large Chilled Water System Control Valve and Piping Zone Management February 2018
MM-21 Save House Compressed Air Station Zone Management February 2018
MM-22-01 Save Domestic Water Heater Zone Management February 2018
MM-22-02 Save Domestic Water Heater (Gas) Zone Management February 2018
MM-22-03 Save Domestic Water Heater (Electric) Zone Management February 2018
MM-22-04 Save Domestic Water Heater (Hot Water Heat Exchanger) Zone Management February 2019
MM-23 Save Compressed Air and Dryer Detail Zone Management February 2018
MM-24 Save 3-Way Coil Piping Detail Zone Management February 2018
MM-25 Save Process Cooling Water Flow Diagram Zone Management February 2018
MM-26 Save Fire Smoke Damper Installation (TYP) Zone Management February 2018
MM-27 Save Typical Air Handling Unit Zone Management February 2018
MM-28 Save Detail Typical VAV/RH Coil Zone Management February 2018
MM-29 Save Make Up Water Shutoff and Alarm Zone Management February 2019
MM-30 Save PCW Storage Tank Zone Management February 2018
MM-31 Save Heating Hot Water System Mechanical Room Guidelines Zone Management February 2019
MM-32-01 Save Sump Pump and Sewage Ejector Detail Zone Management February 2019
MM-32-02 Save Submersible Sump Pump and Sewage Ejector Detail Zone Management February 2019

Back to top

Drawing Category: Utilities Interface

Drawing No

View PDF

Download DWG Title Responsible Organization Approve Date
MS-03 Save Thermowell Standards-Filled Bulb Devices Energy Operations January 2002
MS-04 Save Thermowell Standards-RTD, TC & TID Devices Energy Operations January 2002
MS-10 Save Utility Chilled Water Primary Interface Facilities Energy Management February 2019
MS-12 Save Chilled Water Thrust Block Details Energy Operations January 2002
MS-13 Save Chilled Water Main Butterfly Valve Installation Energy Operations January 2002
MS-14 Save Chilled Water Main and Feeder Trench Details Energy Operations January 2002
MS-16 Save Chilled Water Differential Pressure Transmitter Facilities Energy Management February 2019
MS-17 Save Liquid or Steam Gauge Pressure Transmitter Facilities Energy Management February 2019
MS-18 Save Pressure Differential Switch Across a Pump Facilities Energy Management February 2019
MS-20 Save Vortex Steam Meter Installation Facilities Energy Management February 2019
MS-54 Save Expansion Joint Installation Details Energy Operations July 1998
MS-55 Save Steam Trap Details Energy Operations July 1998
MS-58 Save Electric Condensate Return Receiver & Pump Energy Operations July 1998
MS-59 Save Steam Powered Condensated Return Pump Energy Operations January 1999
MS-64 Save Precast Concrete Trench Section Energy Operations June 1998
MS-65 Save Vault Anchor Support Detail Energy Operations June 1998
MS-66 Save Pipe Guide Precast Steam Trench Energy Operations February 2018
MS-67 Save Steam Safety Relief Valve Energy Operations March 1999
MS-68 Save Utility Hot Water Bldg Interface Facilities Energy Management February 2019
MS-69 Save LTHW Typical Trench Energy Operations February 2019
MS-70 Save LTHW Clearances from Other Underground Utility Energy Operations February 2019
MS-71 Save LTHW Valve Box Energy Operations February 2017
MS-72 Save LTHW Wall Penetration Detail Energy Operations February 2019
MS-73 Save LTHW European Standard Pipe Energy Operations February 2017
MS-74 Save LTHW Expansion Pads Energy Operations February 2017
MS-75 Save LTHW Expansion Pad Layout Detail Energy Operations February 2017
MS-76 Save LTHM Shallow Pipe Detail H20 Loading Energy Operations February 2017
MS-77 Save LTHW Temporary End of Line Shunt and Air Release Detail Energy Operations February 2017
MS-78 Save LTHW Air Release Valves and Drain Assembly Energy Operations February 2017
MS-79-01 Save LTHW Cleaning Piping in Building and Tunnels Facilities Energy Management February 2019
MS-79-02 Save LTHW Cleaning Direct Buried European Standard Pipe Facilities Energy Management February 2019

Back to top

Drawing Category: Planting

Drawing No

View PDF

Download DWG Title Responsible Organization Approve Date
PL-01 Save Tree and Shrub Planting Pit Grounds February 2013
PL-02 Save Tree Staking Grounds February 2013
PL-03 Save 24" Ball and Burlap Tree Planting Grounds February 2013
PL-04 Save 24" Box Tree Planting Grounds February 2013
PL-05-01 Save Tree Well Detail in Planter Strip Location Grounds February 2013
PL-05-02 Save Specifications Grounds February 2013
PL-06 Save Palm Planting / Irrigation In Decomposed Granite Areas Grounds February 2013

Back to top

Drawing Category: Building Controls

Drawing No

View PDF

Download DWG Title Responsible Organization Approve Date
MC-01 Save Controls Network Drawing Facilities Energy Management February 2017
MC-02-01 Save Utility Metering Interface Panel: Retrofit Building (Sheet 1 of 2) Facilities Energy Management February 2017
MC-02-02 Save Utility Metering Interface Panel: Retrofit Building (Sheet 2 of 2) Facilities Energy Management February 2017
MC-03-01 Save Utility Metering Interface Panel: New Building (Sheet 1 of 2) Facilities Energy Management February 2017
MC-03-02 Save Utility Metering Interface Panel: New Building (Sheet 2 of 2) Facilities Energy Management February 2017

Back to top