Search LBRE Documents Library

Keywords:


Searching for:
Keywords:
Category: All
Audience: All
Department: Project Management
Document Title Document Abstract
Clark Center Glazing, LCCA
Facilities Design Guidelines (FDG) Flyer This page contains a link to the Maps and Records FDG page.
Form 1 Departmentally Managed Projects The Departmentally Managed Projects (DMP) Guidelines outline the responsibilities of Department Representatives managing projects where the cost does not exceed $50,000.
Guidelines for Lifecycle Cost Analysis
GUP The GUP Entitlement Policy is the University policy on recovering GUP mitigation costs trough entitlement fees on School and Department facilities growth.
GUP Architectural and Site Approval Procedure Guide This Procedure Guide was prepared by the Stanford University Architect/Planning office (2001) to be used by Project managers during the ASA permitting process with the Santa Clara County Planning Office for projects located on unincorporates Santa Clara County land. This process is designed to incorporate GUP requirements into individual proposed projects.
PDP Volume 2: Contracts
PDP Volume 2: Invoices and Payment Applications
PDP Volume 2: Scoping Phase
PDP Volume 2: Board of Trustees Approval Process: "Heartbeat"
PDP Volume 2: Budget Development
PDP Volume 2: Closeout Phase
PDP Volume 2: Construction Documents Phase
PDP Volume 2: Construction Phase
PDP Volume 2: CP&M Department
PDP Volume 2: Design Development Phase
PDP Volume 2: Executive Summary
PDP Volume 2: Feasibility Phase
PDP Volume 2: Financial Reviews and Reporting
PDP Volume 2: Government Compliance
PDP Volume 2: Introduction
PDP Volume 2: Introduction to Financial Controls
PDP Volume 2: Permitting Phase
PDP Volume 2: Programming Phase
PDP Volume 2: Project Initiation
PDP Volume 2: Project Phases: Sample Page Format
PDP Volume 2: Project Team: Communications Diagram and Group Roles / Responsibilities
PDP Volume 2: Schedule Development
PDP Volume 2: Schematic Design
PDP Volume 2: Summary
PDP Volume 2: Table of Contents
Project Delivery Process, Volume 1 Volume 1 of the Project Delivery Process
Project Delivery Process, Volume 2 Volume 2 of the Project Delivery Process
Project Phases: Sample page format, PDP Volume 2
Seismic Engineering Guidelines Seismic guidelines to be utilized by consultants designing new buildings or renovations at Stanford.
35 documents found.